Detailed environmental survey and risk assessment project for the site of a chemical plant in Xuancheng, Anhui

2019-04-22


Through the on-site site survey and data collection, a sampling technical plan is formulated. Collect soil and groundwater samples, conduct laboratory analysis, determine the pollution factors, pollution range and concentration level of soil and groundwater in the site, and the hydrogeological characteristics of the site, and evaluate the potential threat of environmental pollution to human health based on the above information, calculate The risk control value proposes a site restoration plan. Successfully passed the expert review.

heertong