Detailed environmental survey and risk assessment project for the site of a chemical plant in Xuancheng, Anhui
2019-04-22
Through the on-site site survey and data collection, a sampling technical plan is formulated. Collect soil and groundwater samples, conduct laboratory analysis, determine the pollution factors, pollution range and concentration level of soil and groundwater in the site, and the hydrogeological characteristics of the site, and evaluate the potential threat of environmental pollution to human health based on the above information, calculate The risk control value proposes a site restoration plan. Successfully passed the expert review.

Previous page
Contact us to start the journey of environmental protection
11th floor, block A, changzhou science and technology street, 100m northeast of the intersection of yulong south road and ginkgo road, zhonglou district, changzhou city
联科
Official official account
Copyright © 2022 Jiangsu Heertong Environmental Construction Co. Ltd.