An environmental and ecological restoration project for a non-rule-free mercury refining event in Hunan
2019-04-18
Project introduction:
Illegal mercury refining, accumulation of waste slag, ecological restoration of pollution caused by soil and surface water.
Repair target:
Through the safe transportation of the covered waste residue in different places, the method of stabilizing the contaminated farmland soil sampling ecology + cleaning soil backfilling is repaired, and the retaining wall and diversion trench are constructed to restore the garment production capacity of the farmland soil. Achieve the goal of safe production.