An environmental and ecological restoration project for a non-rule-free mercury refining event in Hunan

2019-04-18


Project introduction:

Illegal mercury refining, accumulation of waste slag, ecological restoration of pollution caused by soil and surface water.

 

Repair target:

Through the safe transportation of the covered waste residue in different places, the method of stabilizing the contaminated farmland soil sampling ecology + cleaning soil backfilling is repaired, and the retaining wall and diversion trench are constructed to restore the garment production capacity of the farmland soil. Achieve the goal of safe production.

 

p